|
you basicly install some plugs where the line goes on the master.
fill the res with fluid
then pump
after the bubbles stop, press the pedal as far as it will go and "bump" it there at the bottom without coming all the way back until bubbles stop coming up in the res.
hook the line back up and dont let the res run dry while you swap the plug for the line.
once the lines and slave are hooked up, open the bleeder valve on the slave. gravity "should" slowly bring fluid down the line. if it doesnt pump the pedal a few times to get it started, again dont let the res run dry.
then bleed the slave, when thats done go back to the line connection on the master and bleed there to make sure there is no more air in the system.
|