Have Fun
Service and RepairPart 1 Of 3
Part 2 Of 3
CHAIN
REPLACEMENT
- REMOVE HOOD SUB-ASSY
- REMOVE FRONT WHEEL RH
- REMOVE ENGINE UNDER COVER LH
- REMOVE ENGINE UNDER COVER RH
- REMOVE FRONT FENDER APRON SEAL RH
- DRAIN ENGINE OIL
a)Install a new gasket and the drain plug after draining engine oil.
Torque:
25 Nm (255 kgf-cm, 18 ft. lbs.)
- REMOVE EXHAUST PIPE ASSY FRONT
- REMOVE ENGINE MOVING CONTROL ROD W/BRACKET
a)Remove the 3 bolts and control rod.
- REMOVE ENGINE MOUNTING STAY NO.2 RH
- REMOVE ENGINE MOUNTING BRACKET NO.2 RH
- REMOVE FAN AND GENERATOR V BELT
- REMOVE ENGINE COVER SUB-ASSY NO.1
- DISCONNECT ENGINE WIRE
- REMOVE GENERATOR ASSY
- REMOVE VANE PUMP ASSY NOTICE: Do not disconnect the hose.
- REMOVE IGNITION COIL ASSY
- DISCONNECT VENTILATION HOSE
- DISCONNECT VENTILATION HOSE NO.2
- REMOVE CYLINDER HEAD COVER SUB-ASSY
a)Remove the bolt and disconnect the engine wire harness clamp.b)Remove the 8 bolts and 2 nuts, and disconnect the cylinder head cover.
- SET NO.1 CYLINDER TO TDC/COMPRESSION
- REMOVE CRANKSHAFT PULLEY
a)Using SST, fix the pulley and loosen the bolt.b)Using SST, remove the bolt and pulley.
- REMOVE CRANKSHAFT POSITION SENSOR
- REMOVE OIL PAN SUB-ASSY
a)Remove the 12 bolts and 2 nuts.
b)Insert the blade of SST between the crankcase and
oil pan. Cut through the sealer and remove the oil pan.
SST 09032-00100
NOTICE: Be careful not to damage the contact surface of the cylinder block and
oil pan.
- REMOVE CHAIN TENSIONER ASSY NO.1
a)Remove the 2 nuts, tensioner and gasket.
NOTICE: Do not revolve the
crankshaft without the tensioner.
- REMOVE V-RIBBED BELT TENSIONER ASSY
a)Remove the bolt, nut and tensioner.
- INSTALL ENGINE HANGER
a)Install the engine hanger No. 1 and No. 2 with the bolts as shown in the illustration.
Parts No.
Torque:
38 Nm (387 kgf-cm, 28 ft. lbs.)
- REMOVE ENGINE MOUNTING INSULATOR
a)Attach the engine chain hoist to the engine hangers.
CAUTION: Do not attempt to hang the engine by hooking the chain to any other part.
b)Remove the bolt and disconnect the engine mounting insulator FR.
c)M/T: Remove the bolt and disconnect the engine lateral control rod.
d)Remove the bolt and disconnect the steering gear return hose clamp from the frame.
e)Remove the 4 nuts from the engine mounting insulator RH. Raise the engine and remove the engine mounting insulator RH.
- REMOVE ENGINE MOUNTING BRACKET RH
a)Remove the 3 bolts and engine mounting bracket.
- REMOVE TIMING CHAIN OR BELT COVER SUB-ASSY
a)Remove the stud bolt for the
drive belt tensioner from the cylinder block.b)Remove the 14 bolts and 2 nuts.c)Pry out the timing chain cover with a screwdriver.
NOTICE: Be careful not to damage the contact surfaces of the timing chain cover, cylinder block and cylinder head.
- REMOVE CRANKSHAFT POSITION SENSOR PLATE NO.1
- REMOVE CHAIN TENSIONER SLIPPER
- REMOVE CHAIN VIBRATION DAMPER NO.1
- REMOVE CHAIN SUB-ASSY
- REMOVE CRANKSHAFT TIMING GEAR OR SPROCKET
- REMOVE NO.2 CHAIN SUB-ASSY
a)Turn the
crankshaft counterclockwise by
90° , and align an adjusting hole of the oil pump driven sprocket with the groove of the
oil pump.
b)Put a bar ([diameter]
4 mm (0.16 inch) ) in the adjusting hole of the oil pump driven sprocket to temporarily lock the sprocket in position. Remove the nut.
c)Remove the bolt, chain tensioner plate and spring.d)Remove the chain tensioner, oil pump driven sprocket and chain.
- INSTALL NO.2 CHAIN SUB-ASSY
a)Set the
crankshaft key into the left horizontal position.b)Turn the cutout of the oil pump drive shaft to the top.
c)Align the mark links (yellow colored links) with the timing marks of the sprocket as shown in the illustration.d)Insert the sprockets with chain to the
crankshaft and
oil pump shaft.e)Temporarily tighten the oil pump driven sprocket with the nut.
f)Insert the damper spring into the adjusting hole, and install the chain tensioner plate with the bolt.
Torque:
12 Nm (122 kgf-cm, 9 ft. lbs.)
g)Align the adjusting hole of the oil pump driven sprocket with the groove of the
oil pump.h)Put a bar ([diameter]
4 mm (0.16 inch) ) in the adjusting hole of the oil pump driven sprocket to temporarily lock the sprocket in position. Install the nut.
Torque:
30 Nm (301 kgf-cm, 22 ft. lbs.)
i)Rotate the
crankshaft clockwise by
90° , and align the crankshaft key to the top.
- INSTALL CHAIN VIBRATION DAMPER NO.1 Torque: 9.0 Nm (92 kgf-cm, 80 inch lbs.)
- INSTALL CHAIN SUB-ASSY
a)Set the No. 1 cylinder to TDC/compression.
1)Align the timing marks of the
camshaft timing gear/sprocket and bearing caps (No. 1 and No. 2).
2)Using the crankshaft pulley bolt, turn the
crankshaft and set the set key on the crankshaft upward.
b)Align the mark link (gold or orange colored link) with the timing mark of the crankshaft timing sprocket.
c)Using SST, tap in the sprocket.
SST 09309-37010
d)Align the mark links (gold or yellow colored links) with the timing marks of the
camshaft timing gear and camshaft timing sprocket. Install the chain.
- INSTALL CHAIN TENSIONER SLIPPER Torque: 19 Nm (194 kgf-cm, 14 ft. lbs.)
- INSTALL CRANKSHAFT POSITION SENSOR PLATE NO.1
a)Install the sensor plate with the F mark facing forward.
- INSTALL TIMING CHAIN OR BELT COVER SUB-ASSY
a)Remove any old packing (FIPG) material and be careful not to drop any oil on the contact surfaces of the timing chain cover, cylinder head and cylinder block.b)Apply seal packing (diameter:
2 mm (0.08 inch) ) as shown in the illustration.
Seal packing: Part No. 08826-00080 or equivalent
NOTICE:
- Remove any oil from the contact surface.
- Install the chain cover within 3 minutes after applying seal packing.
- Do not start the engine for at least 2 hours after installing.
c)Apply seal packing in a continuous bead (diameter:
3 to 4 mm (0.12 to 0.16 inch) ) as shown in the illustration.
Seal packing: Part No. 08826-00080 or equivalent
d)Install the timing chain cover with the 14 bolts and 2 nuts.
Torque:
9.0 Nm (92 kgf-cm, 80 inch lbs.) for bolt A
21 Nm (214 kgf-cm, 15 ft. lbs.) for bolt B
43 Nm (438 kgf-cm, 32 ft. lbs.) for bolt C
9.0 Nm (92 kgf-cm, 80 inch lbs.) for nute)Install the stud bolt to the
drive belt tensioner.
Torque:
10 Nm (102 kgf-cm, 7 ft. lbs.)
- INSTALL V-RIBBED BELT TENSIONER ASSY
a)Install the tensioner with the bolt and nut.
Torque:
59.5 Nm (607 kgf-cm, 44 ft. lbs.)
- INSTALL ENGINE MOUNTING BRACKET RH
a)Install the engine mounting bracket with the 3 bolts.
Torque:
54 Nm (551 kgf-cm, 40 ft. lbs.)
- INSTALL ENGINE MOUNTING INSULATOR
a)Raise the engine and install the engine mounting insulator RH.b)Install the engine mounting insulator RH with the 4 nuts.
Torque:
95 Nm (969 kgf-cm, 70 ft. lbs.) for nut A
87 Nm (888 kgf-cm, 64 ft. lbs.) for nut B
c)Install the steering gear return hose clamp to the frame with the bolt.
Torque:
8.0 Nm (80 kgf-cm, 69 inch lbs.)
d)Install the engine mounting insulator FR with the bolt.
Torque:
87 Nm (888 kgf-cm, 64 ft. lbs.)
e)M/T: Install the engine lateral control rod with the bolt.
Torque:
89 Nm (910 kgf-cm, 66 ft. lbs.)
- INSTALL OIL PAN SUB-ASSY
a)Remove any old packing (FIPG) material and be careful not to drop any oil on the contact surface of the cylinder block and
oil pan.b)Apply seal packing in a continuous bead (diameter:
3 to 4 mm (0.12 to 0.16 inch) ) as shown in the illustration, and install the
oil pan.
Seal packing: Part No. 08826-00080 or equivalent
NOTICE:
- Remove any oil from the contact surface.
- Install the oil pan within 3 minutes after applying seal packing.
- Do not start the engine for at least 2 hours after installing.
c)Install the
oil pan with the 12 bolts and 2 nuts.
Torque:
9.0 Nm (92 kgf-cm, 80 inch lbs.)
- INSTALL CHAIN TENSIONER ASSY NO.1
- INSTALL CRANKSHAFT POSITION SENSOR
a)Install the sensor with the bolt.
Torque:
9.0 Nm (92 kgf-cm, 80 inch lbs.) b)Confirm that the wire harness of the sensor is placed as shown in the illustration.
- INSTALL CRANKSHAFT PULLEY
a)Install the crankshaft pulley.1)Align the pulley set key with the key groove of the pulley, and side on the pulley.2)Using SST, install the pulley bolt.
Torque:
170 Nm (1,733 kgf-cm, 125 ft. lbs.)
b)Turn the
crankshaft counterclockwise and disconnect the plunger knock pin from the hook.
c)Turn the
crankshaft clockwise and check that the slipper is pushed by the plunger.
- INSTALL CYLINDER HEAD COVER SUB-ASSY
- INSTALL IGNITION COIL ASSY Torque: 19 Nm (194 kgf-cm, 14 ft. lbs.)
- INSTALL VANE PUMP ASSY
- INSTALL GENERATOR ASSY
- INSTALL ENGINE WIRE
- INSTALL FAN AND GENERATOR V BELT
- INSTALL ENGINE MOUNTING BRACKET NO.2 RH Torque: 52 Nm (531 kgf-cm, 38 ft. lbs.)
- INSTALL ENGINE MOUNTING STAY NO.2 RH Torque: 64 Nm (653 kgf-cm, 47 ft. lbs.)
- INSTALL ENGINE MOVING CONTROL ROD W/BRACKET
a)Install the engine mounting control rod with the 3 bolts.
Torque:
64 Nm (653 kgf-cm, 47 ft. lbs.)
- INSTALL EXHAUST PIPE ASSY FRONT
- INSTALL FRONT WHEEL RH
- INSTALL HOOD SUB-ASSY Torque: 13 Nm (133 kgf-cm, 10 ft. lbs.)
- ADD ENGINE OIL
- CHECK FOR ENGINE OIL LEAKS